Home / Expert Answers / Civil Engineering / the-original-ground-level-is-determined-at-reduced-level-rl-2-1m-msl-and-the-proposed-road-platfor-pa529

(Solved): The original ground level is determined at Reduced Level (RL) 2.1m MSL and the proposed road platfor ...



The original ground level is determined at Reduced Level (RL) 2.1m MSL and the proposed road platform level is designed at RL 4.0m.From the borelog, it was found that the water level at 0900 is FULL inside the borehole (ground waterat the same level of ground surface). On 1700 of the same day, the water level is repositioned to 2mbelow the ground level. The next day, the SI contractor decided to observe the water table at the sametime as yesterday. It was found that the borehole is filled with water up to the ground surface, both inthe morning and also in the afternoon. Make a soil profile based on statement given.



We have an Answer from Expert

View Expert Answer

Expert Answer


We have an Answer from Expert

Buy This Answer $5

Place Order